(根据安装现场选择安装方式)
(Selection of Installation Method Based on Installation Site)
第一步:测量电动幕尺寸(2组孔中间距离大约罩壳总宽的1/2左右),选择合适的高度,用笔在墙上做好两组打孔标识(建议用水平尺使两组孔保持在同一水平线上),然后打孔,在进行安装。
Step 1: Measure the size of the electric curtain (the middle distance between the two groups of holes is about 1/2 of the total width of the cover), select the appropriate height, mark the two groups of holes on the wall with a pen (it is suggested that the two groups of holes should be kept on the same horizontal line with a horizontal ruler), then drill holes and install them.

第二步:两个人将银幕抬起紧靠装好的挂件,然后缓慢往下移动,直到银幕与挂架卡槽卡住,安装即可完成。
Step 2: Two people lift the screen close to the mounted pendant, then move slowly down until the screen and the hanging rack chute are stuck, and the installation can be completed.
